Plant relocation
Plant relocation moves an existing coating line to a new hall or a new country and brings it back into production. We survey the line, dismantle it in a documented order, re-engineer the parts that must change for the new layout or the new standards, transport, reinstall, recommission the PLC and run trials with your parts.
| Scope | Survey, dismantling, re-engineering, transport, reinstallation, commissioning |
|---|---|
| Reused | Booth bodies, oven panels, conveyor chain and drives where sound |
| Replaced | Insulation, filters, seals, wiring and any part outside standard |



Technical data
The table shows the standard size. Values marked per project are set from your part and line and appear in the proposal, with the drawing for your size.
Quote for your dimensions| Survey | Line drawings, photographs, part list, condition report |
|---|---|
| Dismantling | Documented sequence, labelled panels and ducts |
| Re-engineering | New layout drawing, replaced parts list, updated CE file |
| Transport | Per project |
| Reinstallation | Mechanical and electrical, PLC recommissioning |
| Trials | With your parts, operator training |
How we size it
The new hall decides what changes: a shorter hall may turn a straight tunnel into a U-turn oven; a different conveyor path changes chain length and drives; a new country may change the electrical standard and the conformity file. The survey report lists every item as reuse, repair or replace before you decide.
What it is for
- Factory moves within a country
- Lines bought second-hand that must be re-engineered before use
- Plants moving production to Egypt, Morocco or another country
Options
- Relocation only, or relocation with capacity upgrade
- Interim production planning around the move
- Storage of dismantled equipment at our site between removal and reinstallation
Standards
Reinstalled lines are delivered with an updated CE Declaration of Conformity where the relocation changes the machinery.
Values marked "Per project" in the table are set from your part and line, and appear in the proposal.
Conveyorised line dismantled and ready for shipment
Photographed on site, before hand-over. Every project is listed with its equipment and without the customer's name. Projects
Quote for the plant relocation
Send the part size, quantity and line speed; we reply within 2 working days.